Step 04 – From models to an auditable system.

Development

What we do

Responsibility through operational readiness.

Concepts are worthless if they fail against the reality of implementation. In the Development phase, we take on the hard engineering work. We manage and execute implementation along the V-Model and guarantee processes that withstand any audit. We do not deliver a fragment, but an auditable, integrated complete system.
Development - HILYNX Way
Development - HILYNX Way
What we have answers for

“How do we ensure 100% traceability from stakeholder requirement to unit test”

“How do we orchestrate asynchronously running software and hardware cycles”

“How do we ensure that Continuous Integration (CI/CT) also works for Hardware-in-the-Loop (HiL)”

“How do we generate the evidence for regulatory authorities at the push of a button”

We ensure the seamless interaction of disciplines and orchestrate system development across the entire tool chain. The absolute core of our work here is traceability: every line of code, every hardware component, and every test case must be completely traceable back to an original system requirement. When interfaces fail, we do not retreat to specifications, but solve the problem at the workbench, in the code, or on the test bench.

Our approach

Methods & Frameworks

V-Model (Classic & Agile V) Continuous Integration / Continuous Testing (CI/CT) for Cyber-Physical Systems Hardware-in-the-Loop (HiL) / Software-in-the-Loop (SiL) Testing Configuration Management & Baseline Management

Tools & Ecosystems Used

Git GitLab CI Jenkins Vector CANoe dSPACE Xray PTC MATLAB Simulink Stateflow
Ready for a resilient situational picture?
Speak with us — non-binding and direct.
Previous step in the Hilynx Way
03 – Conception
Next step in the Hilynx Way
05 – Venture